PIMA HOA ANNUAL MEETING

Dear Pima Property Owners:

Pursuant to Article 2, Section 3 of the Bylaws of the Pima Commerce Center Condominium Association, you are hereby given notice of the Annual Meeting to be held on Wednesday, October 17th, 2018.  The meeting will be held at 4:00 pm in the conference room of 14287 N. 87th Street, Suite 220 – Annexus Group, Scottsdale, Arizona  85260.

Please RSVP to jillk@pemreg.com to confirm your attendance and ensure that there will be a quorum.  There has not been a meeting in the last 2-3 years because of a lack of a quorum.

Sincerely,

Jill Shaw Kravitz                                                                                                              Asset Manager  PEM REAL ESTATE GROUP

Maintenance Update 9-10-18

The elevator lobby tile repair is scheduled to start on Wednesday, September 19th, 2018.  It may take up to 2 days to complete the work.  The vendor will be using a “fast dry” tile set which will allow them to be walked on within an hour.  There will also be tape on the tiles for a bit, to help secure them.  

There is one more wall faucet that is awaiting replacement – it should happen this coming Saturday, September 15th.   After that, we will be working to get the stucco repaired and painted, in the areas the replacements occurred.  

Maintenance Update 9-5-18

We will be replacing the broken floor tiles in the elevator lobbies – floor and stairs, later this month.  The vendor is in the process of getting the project on his schedule and we will update all of you, once we have the specific days involved.  We understand it is important to keep the elevators and stairs as accessible as possible, during the repair time.

Maintenance Update 8-22-18

One new wall mount faucet was installed last weekend on the east side of building 14269.  Two additional faucets will be installed this weekend – one on the north side of building 14269 and the other on the north side of building 14275.  After installation is complete, we will have all stucco repaired and painted.  

We are getting bids to replace the broken and cracked tiles in the elevator lobbies.  We will notify you in advance when the work will take place.

Landscaping improvements – we are getting bids to take out some of the overgrown landscaping and install new plants in those areas. As the budget allows we will add plants in other areas that have lost plants over time.  We have made sprinkler repairs and will continue to do so, to keep landscaping looking its best.  

The dumpster area doors have new latches on them, to keep them from blowing open during high winds. Further, new pins are being made to secure the doors into the ground sleeves.

Water intrusion has occurred through some windows on the east side of the buildings during monsoon storms.  We have located a vendor who will be walking the site next week and bidding on the repair work.